Case Study
Case Study

FedEx Field Service Restoration

When a major carrier had lost their DAS system just prior to the home opener, SQUAN was tasked with getting the service up and running as quickly as possible. SQUAN's DAS Black Ops team installed antennas and...

Case Study
Case Study

Canon World Headquarters

SQUAN was responsible for the complete build of the Tyco Electronics (TE) DAS, Public Safety and Two-Way Radio System at Canon's nearly 1,000,000 square foot corporate headquarters in Long Island, NY...

Case Study
Case Study

PSE&G Temp Towers

In an effort to keep capacity and coverage in place SQUAN assisted in the deployment of temporary towers in New Jersey in 2012. This effort was to assist with an upgrade project on all PSE&G towers from...

Case Study
Case Study

252 E. 57th St DAS Build

If you are developer who builds high-rise condos in Manhattan, and you want to ensure your condo owners will be able to use their cell phones in their home, what do you do? That’s where SQUAN comes in. SQUAN designed and is constructing the Distributed Antenna System (DAS) at 252 East 57th...

Case Study
Case Study

Prepping for the Pope: MSG

In preparation for the September visit of the Pope to New York City, T-Mobile needed to boost capacity in mid town Manhattan. SQUAN won the bid to install an equipment shelter on one of the lower roof setbacks of Madison Square Garden. The Ericsson equipment installed in the equipment shelter...

Case Study
Case Study

Becton Dickinson

SQUAN was hired by Becton, Dickinson & Company to augment cellular voice and data coverage at their headquarters in Franklin Lakes, NJ. The site consisted of two large office buildings, each with approximately 400,000 square feet of floor space. The two buildings were connected via enclosed...